Advancing safely with tunnel pioneers

English
  • 中文
  • English

NEWS CENTER

掌握了解行业前沿资讯

Chunfeng Tunnel, Shenzhen, China

Click: Time:2025-02-27 21:59:52

Project Name: Chunfeng Tunnel, Shenzhen, China

Construction Unit: China Railway Tunnel Group Co., Ltd

Equipment number: 588 'Spring Breeze' China Railway Equipment

Blade diameter: 15.8m

Excavation length: approximately 3.6km

Project features:

1. Crossing through numerous buildings and structures, passing through multiple risk sources such as pipelines, bridges, subway lines 1 and 9, and high-rise buildings, with a maximum burial depth of 49 meters.

2. Crossing geological 'complex' formations, with soft upper and hard lower layers and hard rock formations, of which the hard rock section accounts for more than 80% of the excavated strata, distributed in 11 fault zones.

3. The turning radius of the shield tunnel is 'small', with a minimum horizontal curve radius of 750 meters.

Starting year: May 2021

Completion year: December 2022



Chunfeng Tunnel, Shenzhen, China
Project Name: Chunfeng Tunnel, Shenzhen, China Construction Unit: China Railway Tunnel Group Co., Ltd. Equipment Number: 588 "Chunfeng" China Railway Equipment cutterhead diameter: 15.8m
Long by picture save/share
0

Home          Product Center          Performance Case          News          About Us          Contact Us

Tel:+8615333366444

Email:ChenXing@cnlfcx.com

Add:No.1 Tongsheng Road, South Industrial Park, Gu'an County, Langfang City, Hebei Province

图片展示

Phone: +8615333366444
Email: ChenXing@cnlfcx.com
Address: No.1 Tongsheng Road, South Industrial Park, Gu'an County, Langfang City, Hebei Province

© 极速飞  粤ICP备56969900号-2

Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.